EirGrid Case Study
EirGrid is responsible for operating Ireland’s national electricity transmission system – otherwise known as the National Grid. This includes planning and developing the system, scheduling and dispatching generation, operating the electricity market and ensuring system security
EirGrid significantly reduced the inherent risk of damage to their business critical asset from third parties.
As a direct result of becoming a member of LSBUD, EirGrid has significantly reduced the inherent risk of damage to their business critical asset from third parties who were not aware of the location of EirGrid’s Interconnector in Great Britain.
“LSBUD’s fully automated delivery of drawings and work procedures to third parties ensures the right people get the right drawings and data every time”
Conor McNamee – Senior Lead Engineer, Eirgrid East West Interconnector Limited